Market Intelligence / Paper No. 5

Bankability for solar modules and battery storage: Tier 1 and what lenders check

Many solar and storage makers want the Tier 1 badge, and it is often misunderstood. It is not a quality rating, and no test lab awards it. With the world able to make about twice as many modules as it installs, new trade barriers in the US and storage growing fast, more makers need to win projects that banks finance. This paper explains what BloombergNEF’s two Tier 1 lists measure, what lenders’ technical advisers check beyond them, and how to build the evidence.

Bankability · 9 minute read · Version 2.0, 9 November 2026

Why bankability matters now

With supply far above demand, module and storage makers must win lenders’ trust to sell.

The world can now make far more solar modules than it installs. Enerdata estimates global module manufacturing capacity at 1,315 GW in 2025, against record installations of 664 GW, with factories running at about 49% of capacity on average. Makers compete hard for every sale.

Trade barriers are narrowing the easier markets. In November 2026 the United States imposed anti-dumping and countervailing (anti-subsidy) duties on crystalline silicon cells, including cells assembled into modules, from India, Indonesia and Laos. For India, the final rates are a 123.04% dumping margin and a 126.09% subsidy rate, which add up to 249.13%; after an offset for export subsidies, importers pay cash deposits of about 233%. India shows what this means for a maker: about 97% of its 4.5 GW of module exports in 2025–26 went to the US, and its 233 GW of module capacity ran at an estimated 35 to 40%.

Storage is growing fast. BloombergNEF counted a record 112 GW (307 GWh) of new energy storage worldwide in 2025 and expects 158 GW (459 GWh) in 2026. Publicly funded programmes add more, such as India’s tenders for about 43 GWh under earlier schemes and 30 GWh under a scheme approved in November 2026.

Many utility-scale projects are financed by banks, and banks rely on technical advisers who screen suppliers before they lend. So module and storage makers that want to grow in new markets need the evidence those lenders ask for.

Who gains? Makers with a record of bank-financed projects and independent test results. Who loses out? Makers that depend on one export market, and any maker competing on price alone.

  • 1,315 GWGlobal module manufacturing capacity in 2025, against 664 GW installedEnerdata, Jul 2026
  • 158 GWNew energy storage BloombergNEF expects worldwide in 2026, up from 112 GW in 2025BloombergNEF, May 2026

What Tier 1 is

Tier 1 counts bank-financed projects. It does not rate quality, for modules or for storage.

BloombergNEF (BNEF), the research firm, publishes separate Tier 1 lists for solar modules and for energy storage. Both ask the same kind of question: have independent buyers and commercial banks put money behind projects that use this maker’s own-brand products, made in its own factories? Non-recourse means the loan is repaid from the project’s own income, with no claim on the owner’s other assets.

For modules, the test is six different projects, each larger than 10 MW (megawatts), financed non-recourse by six different commercial banks, within the past two years. The 10 MW threshold has applied since the second quarter of 2025; it was 5 MW before that, and 1.5 MW before 2024. For storage, it is six eligible projects of at least 10 MW or 10 MWh (megawatt-hours) in the past two years, with at least three buyers independent of the maker, and, since August 2026, at least one project financed non-recourse by two different commercial banks. On both lists, development banks and export-import banks do not count, refinancings of older projects do not count, and makers whose products are made by others under their brand are not tiered.

BNEF describes both classifications as purely a measure of industry acceptance. They do not assess product quality or financial strength. That is why buyers and lenders use them as a shortcut, and why they are so often misused: a marketing team reads “Tier 1” as “top quality”, and the claim ends up in a presentation.

From our team’s earlier work

In a market-entry programme run by members of our team in their previous roles, an earlier investor presentation had said the manufacturer held Tier 1 status for years. It had not. Every external document was corrected before the next investor meeting. The correction became a standing rule: nothing goes into a presentation unless the register, the certificate or the bank letter supports it.

  • 6 banksSix projects, each financed non-recourse by a different commercial bankBloombergNEF, Sep 2026
  • >10 MWSize of each project, since the second quarter of 2025BloombergNEF, Sep 2026
  • 2 yearsThe window for the financingsBloombergNEF, Sep 2026

How the storage list differs from the module list

The storage list needs one bank-financed project, not six, so it is far easier to reach.

The two lists look alike but set very different bars. A module maker needs six projects, each with a different commercial bank. A storage maker needs six eligible projects, at least three independent buyers, and just one project financed non-recourse by two commercial banks.

Solar modulesEnergy storage
Projects neededSix projects in the past two years.Six eligible projects in the past two years.
Size of each projectOver 10 MW.At least 10 MW or 10 MWh.
Bank testEach project financed non-recourse by a different commercial bank: six banks in all.At least one project financed non-recourse by two different commercial banks (since August 2026).
BuyersNo separate test.At least three buyers independent of the maker.
Who can be listedModule makers with their own factories.Cell makers and system integrators with their own factories.
Also excludedDevelopment and export-import bank loans; refinancings.Also backup-power, demonstration and mandate-driven projects, lead-acid batteries, and buyers linked to the maker.
PublishedAfter the 18th of February, May, August and November.End of January, April, July and October.

One storage exclusion matters in several markets. Storage built to meet a renewable-integration mandate does not count, so storage installed only because a rule requires it alongside new solar or wind may not qualify. India has proposed such a rule, and China’s mandate projects count only if financed from 2026.

Who gains? Storage makers and integrators with their own factories and a few independent, bank-financed projects. Who loses out? Storage makers selling mainly to affiliated buyers or into mandate-driven projects.

What a submission contains, and where it fails

Qualifying depends on the paperwork as much as on the projects.

A submission to BNEF has five parts, on either list. The table shows what BNEF looks for in each, and where submissions usually fall short. Since September 2026 BNEF has also published a web tool showing which projects each supplier has supplied, so buyers can check a claim for themselves.

Part of the submissionWhat BNEF looks forWhere it usually fails
Project listSix eligible projects in the past two years using your own-brand, own-made products.Projects supplied through a distributor or under another brand; refinancings of older projects.
Financing evidenceModules: six projects, each financed non-recourse by a different commercial bank. Storage: at least one project financed non-recourse by two commercial banks.Corporate loans, balance-sheet funding, development-bank loans, or the same bank on several projects.
Bank documentsFor deals in China, India, Poland, Austria, Hungary, Switzerland and Turkey, extra proof the loan was non-recourse: a press release from a party to the deal, a report by a recognised media firm, or a copy of the bank agreement, which BNEF keeps confidential.Developer emails or statements on their own, which BNEF does not accept.
ManufacturingProducts made in factories you own.Volume made by a contract manufacturer, or products from a partner’s plant.
TimingEvidence in before each quarterly list: modules after the 18th of February, May, August and November; storage at the end of January, April, July and October.A quarter is lost because evidence gathering started late.

Who gains? Makers whose sales and finance teams collect the bank evidence at the time of each sale. Who loses out? Makers whose modules went into qualifying projects but who cannot prove it.

What a lender’s technical adviser checks beyond the badge

Advisers check the product, the factory and the company, not just the badge.

A lender’s technical adviser is the independent engineer who checks a project’s technology and suppliers for the lenders. They look well beyond Tier 1.

  • Product. CB certificates (internationally recognised test certificates) under IEC 61215 and 61730, the module design and safety standards, for the exact models supplied. The extra tests the datasheet claims: potential-induced degradation (PID, power loss under electrical stress), salt mist, ammonia and transport. Third-party reliability scorecards and field performance data, where available.
  • Factory. ISO 9001, the general quality standard, as the minimum, and IEC TS 62941, the quality standard for module factories, as the benchmark. Traceability from each batch of cells to each module’s serial number. Checks on incoming materials and testing at the end of the production line. Factory audit reports the adviser can rely on.
  • Company. Audited accounts, debt, order book and reliance on a few large customers. Warranty terms and the company behind them, with third-party warranty insurance. Governance, stock-exchange listing and the quality of your disclosures. In short: will you still be there in year twelve?

For storage, advisers add checks of their own. They look at the cell supplier and how its cells are sampled and tested batch by batch, fire protection to local and national standards, and warranty terms, which usually depend on the system staying within limits on depth of discharge, cycles and temperature. Lenders focus on contractual protection against underperformance, such as guarantees of usable energy and liquidated damages for delay, and on the credit strength of the supplier. One industry database maintained by the analytics firm TWAICE attributes about 45% of severe storage incidents to failures in control and communication between the energy-management and battery-management systems, and about 10% to the cells themselves.

Who gains? Makers with full test records, audited factories and a balance sheet that will outlast the warranty. Who loses out? Makers relying on the badge alone.

Independent test scorecards and ratings

Test results now separate suppliers, because failures are rising across the industry.

Lenders’ advisers also read independent test results. Kiwa PVEL’s 2026 Module Reliability Scorecard, its twelfth, found that 87% of manufacturers tested had at least one failure, up from 66% in 2024. Forty-three manufacturers were named Top Performers in at least one test, down from 50. Results come from Kiwa PVEL’s Product Qualification Program, which a manufacturer joins by submitting modules for testing.

The Renewable Energy Test Center’s 2026 PV Module Index reported its highest rates of “red flag” results in damp heat (11%) and ultraviolet-induced degradation (8%). PV Tech Research’s quarterly PV ModuleTech bankability ratings grade leading suppliers from AAA to C on financial and manufacturing strength. For storage, PV Tech Research publishes Battery StorageTech bankability ratings, also from AAA to C, based on financial health, manufacturing and shipments. In the second quarter of 2026 it upgraded CATL to AAA and downgraded Wärtsilä to BB.

Who gains? Makers whose modules pass independent testing and who publish the results. Who loses out? Makers with no independent test history, who start every lender review from zero.

  • 87%Manufacturers with at least one test failure, up from 66% in 2024Kiwa PVEL, May 2026
  • 43Manufacturers named Top Performers in at least one testKiwa PVEL, May 2026

What bankability means for each type of business

Bankability is built from evidence over several quarters, and claims beyond the evidence cost more than they earn.

  • Module makers. Count your qualifying financings, collect the bank evidence and target sales at bank-financed projects. Add independent test results and warranty backing.
  • Storage makers and integrators. The list is within reach: six eligible projects, three independent buyers and one bank-financed project. Avoid relying on affiliated buyers or mandate-driven projects.
  • Developers and EPC contractors. Check supplier claims against BNEF’s lists and project tool, and ask for the full bankability pack, not the badge.
  • Lenders and investors. Treat Tier 1 as a screen, and rely on the technical adviser’s review of product, factory, contracts and company.

If you are not there yet: what to do next

Five steps to gather genuine evidence, and to claim only what you hold.

BNEF publishes the list every quarter, so allow a quarter or more to gather the evidence. That is a planning period, not a promise: whether you qualify depends on the financings behind your modules.

  1. Take the inventory. List every eligible project in the last 24 months supplied with your own-brand products, with its size, buyer, financing structure and lender. Check you hold the paperwork for each one.
  2. Ask your customers. Ask for a copy of the loan agreement, or point to a press release or media report of the financing. BNEF does not accept developer emails on their own. Sales teams rarely ask; finance teams must.
  3. Close the gap deliberately. Module makers: aim the next sales at projects with new non-recourse lenders until six banks are covered. Storage makers: secure one project financed by two commercial banks, with independent buyers.
  4. Submit on time. Package the project list, the bank evidence and your manufacturing details before the quarterly window. Keep the file current for the next list.
  5. Say only what you hold. Unless and until the classification is granted, external material says “Tier 1 submission in progress”, or nothing. Build the wider bankability pack anyway, because the adviser will ask for it either way.

Words used in this paper

  • Bankability: How willing banks are to lend to a project that uses a particular product or supplier.
  • BloombergNEF Tier 1: BloombergNEF’s quarterly lists of module and storage makers whose products are in bank-financed projects. They measure bankability, not quality.
  • Non-recourse project finance: A loan repaid only from the project’s own income, with no claim on the owner’s other assets.
  • Lender’s technical adviser: An independent engineer who checks a project’s technology and suppliers for the lenders.
  • Own-brand, own-manufacture: Products sold under the maker’s own name and made in its own factories.
  • IEC 61215 and IEC 61730: International standards for a solar module’s design and durability, and its safety.
  • IEC TS 62941: An international specification for the quality system in a module factory.
  • Warranty insurance: Third-party insurance that pays warranty claims if the maker cannot.
  • Anti-dumping and countervailing duties: Extra import duties on goods judged to be sold below fair value or subsidised.
  • Kiwa PVEL and RETC: Independent test laboratories that publish annual module reliability results.
  • MWh: Megawatt-hour, a measure of how much energy a storage system holds.
  • System integrator: A company that assembles cells and controls into complete storage systems in its own factory.
  • Liquidated damages: A fixed sum a supplier pays if it is late or the system underperforms.

Figures and rules were checked on 9 November 2026. BloombergNEF reviews its methodology from time to time, so check the current version before you submit. This is general information, not legal, tax or investment advice.

Sources

  1. BloombergNEF, “Tier 1 Solar Module Methodology” (4 September 2026): assets.bnef.com
  2. BloombergNEF, “Tier 1 Energy Storage Methodology” (15 August 2026): assets.bnef.com
  3. IEC TS 62941, “Terrestrial photovoltaic modules: quality system for PV module manufacturing”
  4. PV Tech, “India’s solar module overcapacity to persist through 2030 as capacity reaches 233GW” (2 September 2026), on IEEFA and JMK Research: pv-tech.org
  5. IEEFA and JMK Research, “Assessing overcapacity risk in India’s solar PV manufacturing market” (September 2026): ieefa.org
  6. PV Tech, “US finalises AD/CVD duties on solar cell imports from India, Indonesia and Laos” (14 September 2026): pv-tech.org
  7. Mercom via now.solar, “US to impose antidumping, countervailing duties on solar imports from India” (16 October 2026): now.solar
  8. PV Tech, “Module test failures continue to increase in Kiwa PVEL’s 2026 Module Reliability Scorecard” (27 May 2026): pv-tech.org
  9. PV Tech, “Damp heat and UVID show highest ‘red flag’ rates in 2026 RETC module testing report” (3 June 2026): pv-tech.org
  10. PV Tech Research (Solar Media), “PV ModuleTech Bankability Ratings quarterly report”: research.pv-tech.org
  11. Energy-Storage.news, “CATL upgraded to AAA, Wärtsilä downgraded to BB in Bankability Report Q2 update” (2026): energy-storage.news
  12. ESS News, “Quality control underpins bankable BESS projects” (29 June 2026): ess-news.com
  13. Sargent & Lundy, “Battery energy storage systems: independent engineering due diligence”: sargentlundy.com
  14. Energética India, “43 GWh of BESS supported under VGF scheme with INR 9,160 Cr outlay: Power Minister” (6 August 2025): energetica-india.net
  15. Prime Minister’s Office, “Cabinet approves Rs.14,500 crore Viability Gap Funding Scheme for development of 92 GWh Grid-Scale Energy Storage Systems” (4 November 2026): pmindia.gov.in
  16. Enerdata, “The new global reality for PV module manufacturers” (22 July 2026): enerdata.net
  17. Energy-Storage.news, “BloombergNEF forecasts 158GW of global energy storage deployments in 2026” (May 2026): energy-storage.news
  18. US Department of Commerce, countervailing duty orders on crystalline silicon PV cells from India, Indonesia and Laos, Federal Register (9 November 2026): thefederalregister.org
  19. OW Solar, “Final solar duties: India, Indonesia, Laos” (14 September 2026): owsolar.com

Talk to us

We can build the evidence that buyers and lenders' technical advisers ask for, and tell you honestly where the gaps are.

Book a consultationOr write to us

The UK and EU Market Entry project: deliverables and fees

Web page, 15 November 2026: a source link updated because the publisher moved or removed the original page. Version 2.0, 9 November 2026: retitled, rewritten in plainer language, slides redesigned with a takeaway on every slide, and every figure rechecked against BloombergNEF’s module methodology of 4 September 2026 and storage methodology of 15 August 2026. Widened to cover battery storage as well as solar modules, and written for makers worldwide. Added: why bankability matters now (Indian overcapacity and final US duties), BNEF’s accepted proof for non-recourse deals and its new project tool, independent test scorecards, who gains and who loses out, and what bankability means for each type of business. Version 1.3, 5 November 2026: the closing panel of the PDF and PowerPoint was aligned with the web page. Version 1.2, 4 November 2026: wording made more measured and earlier work attributed to our team's previous roles. Version 1.1, 26 October 2026: Tier 1 project-size threshold corrected to over 10 MW.

More papers: Registering solar modules under MCS · EU battery passport: what to have ready · India’s battery storage local-content rules · UK and EU trade deals with India: what changes for clean-tech · Factory capex before financial close

Register to download

You can read every Market Intelligence Paper online. Register once to download all six as PDF or PowerPoint.

All fields are required unless marked optional.

We use these details to send you the paper and to understand who reads our research. See the privacy notice.

You only need to do this once on this browser.