Paper No. 4 · Trade · September 2026
The UK–India trade agreement has been in force since July 2026, and the EU–India agreement is due to be signed in December. This paper explains what they change for solar, storage and equipment makers, and what they do not.
For: Clean-energy manufacturers, developers and equipment makers in India, the UK and Europe.
10 minute read · 16-page slide-format PDF · 16-slide deck · 27 sources
Version 2.0, 9 November 2026.
Paper No. 1 · Market entry · September 2026
UK rooftop installers may only fit modules listed under MCS. This paper explains how to get your modules listed in 2026, and what else a UK distributor will ask for.
For: Export, certification and sales leads at solar module manufacturers selling to UK homes, commercial rooftops and small ground-mounted sites, wherever the factory is.
10 minute read · 16-page slide-format PDF · 16-slide deck · 12 sources
Version 2.0, 6 November 2026.
Paper No. 2 · Storage · September 2026
From 18 February 2027, industrial batteries above 2 kWh sold in the EU need a digital battery passport. This paper explains what it contains, where the data comes from and what to build now.
For: Founders, technical leads and compliance leads at battery storage makers and integrators selling racks, packs or containers into the EU, wherever the factory is.
7 minute read · 13-page slide-format PDF · 13-slide deck · 13 sources
Version 2.0, 6 November 2026.
Paper No. 3 · India · September 2026
India’s Cabinet has raised the minimum Indian content for battery projects under its new storage funding scheme from 20% to 40%. This paper explains what that means for each part of a battery system, and the routes for manufacturers and their technology partners.
For: Battery storage manufacturers, integrators and developers bidding for publicly funded projects in India.
10 minute read · 16-page slide-format PDF · 16-slide deck · 17 sources
Version 2.1, 9 November 2026.
Paper No. 5 · Bankability · September 2026
What BloombergNEF’s Tier 1 lists for solar modules and energy storage measure, how the two differ, what lenders’ technical advisers check beyond them, and how makers anywhere can build the evidence to win projects that banks finance.
For: Founders, CEOs, CFOs and heads of sales at solar module makers and battery storage makers and integrators worldwide, especially newer makers entering export markets.
9 minute read · 13-page slide-format PDF · 13-slide deck · 19 sources
Version 2.0, 9 November 2026.
Paper No. 6 · Financial close · September 2026
How going through a factory’s capex line by line before financial close separates what must be funded on day one from the total project cost, and why lenders approve a tested model, not a list of savings.
For: Founders, CEOs, CFOs and investors in clean-energy manufacturing projects, such as solar, battery and component plants, heading for a project loan anywhere.
6 minute read · 12-page slide-format PDF · 12-slide deck · 5 sources
Version 2.0, 9 November 2026.